Frinton GC | Essex
EDI were commissioned by FGC to look into the redesign of the their course bunkering via a comprehensive bunker masterplan.
EDI commenced Phase I of the project looking at the 14th, a strong, gently dog-legging par 4 which required re-bunkering due to the original hole being a par 5 (we believe). The green was protected far too strong for the approach that was asked of the player. Following a montage proposal, the work was completely in 2016 leading on to a Phase II, comprehensive bunker masterplan.
STATUS: Phase I, 14th Greenside bunkering complete, Phase II - Bunker masterplan complete.
SLIDES: [1] Google Earth Pro Aerial [2] EDI Bunker Masterplan [3] EDI completed 14th Bunkering [4] EDI Montage [5] Clubhouse